We were told 1 month minimum to get the work done. I am being realistic and saying 2. The clean up has started and will likely be finished this coming week but then all the repairs will need to be made and waiting for contractors to do it. I think we will likely do some of it ourselves (flooring, painting, baseboards etc) so it can be done faster. I am dreading having the kids in my upstairs as the space is much smaller and the toys will be limited and it really isn't set up daycare. I will enjoy having a bathroom on the same floor and lots of light. Will be more TV and limited art/crafts (all my craft stuff is packed away). Luckily it is summer so we can be outside more.

And as for our bad luck streak - nope still going strong. Took the car in yesterday and had to order a part that wasn't covered by warranty. Went to soak my aching body in the hot tub this morning only to find a leak in the pump. My husband is draining it and taking it apart right now. I will also have to reimburse all families for my one day closed. Sigh....trying to remain positive.